For housing providers

Trial greywater
reuse in one home.

Aqua Gratis reuses bath and shower water to flush toilets. Start with a property you manage to check the layout, plan maintenance and measure the change in mains water use.

Housing studyIllustrative layout
Architectural illustration of three neighbouring homes, with one highlighted in Cascade blue as a possible pilot property
Select a house type that recurs across your stock.

01 / Property fit

Which home
will you assess?

Pick a layout your team knows. A floor plan with baths, showers, toilets and the proposed unit position gives Cascade a starting point for checking pipe routes and service access.

Choose your project route
First property review

An existing occupied home

Ask the resident and repairs team about bathroom use, access for the survey and a workable time for any installation. Mark the proposed unit position and route to the cistern on the plan.

Measurement starting pointCheck whether earlier mains meter readings are available. Agree a baseline period before fitting the unit.

Compare Aqua Gratis configurations
A blue enclosed toilet unit beside a second exhibition display with its tanks and pipework exposed
Enclosed WC and exposed system at a Cascade exhibition display.

02 / Residents & repairs

Who looks after
the unit?

Agree the handover with the housing team, installer and Cascade before the trial begins.

Repairs team
Identify who takes a fault report, who can attend and how they will reach the unit. Ask Cascade for the servicing schedule for the proposed model.
Resident
Explain which toilets use the recovered water, what to expect during installation and who to call if a cistern stops refilling.
Asset manager
Keep the model, location, handover notes and service records with the property. Log visits and downtime so they can be reviewed alongside water use.

03 / Measuring the pilot

What would justify
a second property?

Agree the comparison method and a review date before installation. Water use, the work involved in servicing the unit and residents’ experience all belong in the decision.

  1. 01

    Set a baseline

    Record mains water use and occupancy. For a new build, agree a comparable occupied home or a documented design estimate and record the assumptions.

  2. 02

    Track what changes

    Agree how to measure litres delivered to cisterns and whole-home mains use over comparable periods. Note changes in occupancy, leaks and time out of service.

  3. 03

    Review the trial

    Compare mains use per occupied day, then review the readings alongside reused litres, service visits and resident feedback. Decide whether to trial a second house type.

Project enquiry

Prepare your
first pilot brief.

Use this brief with your housing team, or send it to Carolyn. A property type and a sketch of the bathroom layout are enough to start a conversation.

Carolyn HoggManaging Director, Cascade Water Productscarolyn@cascadewater.life
Housing pilotProperty brief
Preview the brief

Copy the brief for your housing team, or send it to Carolyn below.

We'll use these details only to reply to this enquiry (privacy notice). Prefer email? Prepare an email instead.